Friday, June 8, 2012

Sunday, Sunday, Sunday. Keynote, keynote, keynote.

I'm giving a keynote (well ... half of a keynote, the other half by Steve Bush) this Sunday at the Research to Standards workshop, held alongside next week's ICC in Ottawa. We'll be talking about the role standards play in emerging technologies, like nanonetworking. This is related to our own work in leading the IEEE 1906.1 nanonetworking standardization effort.

1906.1 is a new idea for the Communications Society. Historically, standards have been used to consolidate industrial interest around established technologies. Now, we're using the standardization process to get everyone talking the same language, get interest from industry, and avoid dilution of the idea at the beginning of the technology cycle. So far the project is a resounding success: we have academics from around the world, plus representatives from large industrial players, as well as several government research bodies.

We're speaking from 9:15 to 10:00 on Sunday. I don't have the location yet, but check here for the details. Hope to see you there.

Tuesday, May 29, 2012

CWIT 2013 etc.

I'm the general chair of CWIT 2013, which will be held in Toronto next May. We just issued the first Call for Papers [PDF]; submission deadline is February 1.

CWIT is not just for Canadians - it's more of a "Canadian showcase" than a "Canadian club". And Toronto is lovely in May. So please give some thought to a submission.

Meanwhile, congrats to my old PhD supervisor, Frank Kschischang, for winning the 2012 Canadian Award for Telecommunicaitons Research.

Monday, May 7, 2012

Eckford's Rules of North American Air Travel

  1. Never connect through ORD. 
    • If you must violate this rule, allow at least 4 hours for your connection.
    • Add an additional 2 hours if you have to clear customs.
  2. If you're flying to a final destination that is less than a three hour drive from a major northeastern hub (e.g. IAD, EWR), forget trying to connect and just drive from the hub. 
    • Unless the driving route passes through a notorious traffic area.
  3. Never fly codeshare. If an airline offers you a codeshare flight, make the booking directly with the codeshare airline.
    • Avoid affiliate airlines (United Express, American Eagle) and fly on the mainline if possible.
I broke all three of these rules on a recent trip. Result: 14-hour overnight delay.

Thursday, April 26, 2012

Ceiling function considered harmful

Often in my 4th year mobile communications class, I'll ask a question like the following:
A cellular telephone system is intended to cover an area of 36 square km. Suppose FDMA is used, where the total system bandwidth is 100 MHz, and each call occupies 30 kHz. The system should support 40,000 simultaneous calls in the entire coverage area. Assuming a cluster size of 7, how many cells are needed?
This is a very easy question to solve, and I ask it to get students thinking about radio resources. (Granted that circuit-switched telephony is now obsolete with LTE.) The solution looks like this: at 30 kHz per call, 100 MHz supports 3333 calls; to get 40,000 calls, you need 40,000/3333, or about 12 times the system bandwidth (i.e. 12 cell clusters); with 7 cells per cluster, that's 12 x 7 = 84 cells.

But the problem is that 40000/3333 is slightly more than 12; it's exactly equal to 12 + 4/3333, or 12.00120012... . Multiplying this number by 7, we get 84 + 28/3333, or 84.00840084... .

Since the number of cells must be an integer, a typical student reaction is to take the ceiling of the answer: ceil(84.00840084...) = 85.

But that's bonkers. We "need" an extra 0.0084 of a cell, so the answer is to build a completely new cell tower to satisfy this tiny demand. Cell towers are expensive. And in fact, 12 clusters can cover 39,996 users, so the extra cell would serve a grand total of four calls. The revenue from that -- and even, let's say, the possible contractual penalties for not hitting exactly 40,000 calls -- would never be worth it.

Instead of blindly using the ceiling function in response to these questions, we should encourage students to think about the assumptions behind the question. Allowing a bit of flexibility (e.g., slightly relaxing the "40,000 call" assumption) would lead to a much more realistic and useful answer, and better engineering.

Tuesday, April 3, 2012

Thomas M. Cover, 1938-2012

[via]
I never met Tom Cover. But like every PhD in information theory, I came to know him through his book.  

Elements of Information Theory, better known as Cover and Thomas, is the gold standard for a graduate-level mathematics textbook: always readable, rigorous but never tedious, and comprehensive; one that captures both the elements and the spirit of the discipline. You have to imagine that, if The Book has a section on information theory, it's just Cover and Thomas, verbatim.

Its influence on the field has been so vast, a colleague once said, that "we're not information theorists, we're Coverists."

Thomas M. Cover August 7, 1938 - March 26, 2012

Monday, April 2, 2012

Hidden York: Power generation and distribution facilities

The chimneystack is York's most widely ignored major landmark. Yet at the base of that chimney is enough heavy machinery to generate and distribute 10 MW of electrical power (about half of the university's maximum power needs), plus all of York's heating and cooling. Without it, we would all literally freeze -- or swelter -- in the dark.

Because the university's facilities department wants to play a role in our new electrical engineering program (especially our planned Power specialization), I had the rare opportunity to take a tour of the generation, distribution, and steam generation facilities. Many thanks to Brad Cochrane and Gary Gazo for showing me around. Pictures after the jump.

Thursday, March 29, 2012

The zombie Sheppard subway must die: A rant


I ride transit to work. And like every Toronto transit rider, I have an opinion. Here it is.

Council has spoken: the Sheppard subway is a failure. It's costly and underused. It's not worth extending, even if it could be done for free. Now, east of Don Mills Road, Sheppard will be served by LRT; outside of the mayor's fever dreams, the Sheppard Subway will never be extended beyond its 5.5 km, five-stop stubby existence. It's dead.

But not really: council committed the key horror movie mistake of not finishing the job. After all that rhetoric of how terrible the Sheppard subway is, how short and pointless, how worthless it would be to extend (all good points!) ... it's still on the map. People are still going to ride it for the foreseeable future. The Sheppard LRT plan sets its undead, poorly designed, unexpandable failure in concrete for our childrens' children to admire.

This zombie subway will haunt every discussion about transit in the north end from now until kingdom come. Any time rapid transit north of Eglinton gets discussed, some bright-eyed person will ask, "Well, wouldn't it be better just to extend the Sheppard subway?" And then we get to have the very same knife fight about transit over and over, like that time Kelsey Grammer was on Star Trek.

There's only one solution: the zombie Sheppard subway must die.

How does that happen? We cut out its heart: convert the subway so that the LRT can use it. One seamless trip from the current subway tunnels, on to the surface and into the east end.